$499
I want this!Pay in 5 installments

Northern-usa-data-corridor-2026-Tools

$499

Premium Interactive Tools & Appendices Package

Unlock the Full Analytical Power of the Northern USA Data Corridor 2026 Report

This comprehensive digital toolkit provides 6 premium interactive calculators and 6 detailed appendices designed for investors, developers, and operators evaluating data center opportunities in the Northern USA (Pennsylvania, Ohio, Michigan).

📊 What's Included:

Interactive Investment Tools:

  • Strategic Scoring Matrix - Compare all 50 Golden Sites across 8 weighted criteria with live filtering
  • Opportunity Cost Calculator - 10-year NPV analysis comparing PJM queue vs. brownfield acquisition
  • Free Cooling EBITDA Calculator - Compare PUE efficiency and annual savings across 6 locations
  • Heat ROI Modeler - Calculate returns for waste heat recovery (district heating, greenhouse, industrial)
  • CIR Transfer Analyzer - Identify 12 sites with transferable Capacity Interconnection Rights (12.8 GW)
  • ESG Carbon Calculator - Quantify emissions savings and carbon credit value with behind-the-meter solutions

Comprehensive Appendices:

  • Appendix A: Full Site Database (50 sites with coordinates, specs, owner contacts + CSV export)
  • Appendix B: PJM Queue Analysis (capacity price evolution $28 → $329/MW-day, timeline projections)
  • Appendix C: Interactive Map (Leaflet.js with GeoJSON/KML export, infrastructure layers)
  • Appendix D: Regulatory Guide (state-by-state tax incentives, permitting, utility contacts for PA/OH/MI)
  • Appendix E: Financial Models (4 TCO scenarios: 50/100/200/300 MW with CapEx/OpEx breakdowns)
  • Appendix F: References (70+ verified sources - PJM docs, EIA data, industry publications)

💡 Why These Tools Matter:

  • Save $50M-$150M+ by avoiding PJM interconnection queue costs
  • Accelerate time-to-market from 5-7 years to 12-24 months with brownfield sites
  • Optimize EBITDA with 5,000+ free cooling hours/year in Rust Belt locations
  • Leverage existing grid infrastructure with transferable CIRs from retired coal/nuclear plants
  • Make data-driven decisions with real TCO models and site comparison matrices

✅ Perfect For:

  • Data Center Developers & Operators
  • Infrastructure Investors & Private Equity
  • Hyperscale Cloud Providers (AWS, Microsoft, Google, Meta)
  • Colocation & Enterprise IT Teams
  • Energy & Site Selection Consultants

🛠️ Technical Specs:

  • Format: HTML5 + Interactive JavaScript (runs locally, no internet required)
  • Compatibility: All modern browsers (Chrome, Firefox, Safari, Edge)
  • Data Export: CSV, GeoJSON, KML supported
  • Mobile Responsive: Optimized for desktop and tablet viewing

⚖️ Legal Disclaimer:

All tools provided for preliminary analysis purposes only. Consult qualified professionals (engineers, financial analysts, legal counsel) before making investment decisions. Results are estimates and do not guarantee future performance.


Get instant access to the complete Northern USA Data Corridor 2026 analytical toolkit - the same tools used to identify $150B in brownfield opportunities.


I want this!Pay in 5 installments5 equal monthly installments of $99.80

You will get instant access to the complete Execution Toolkit: ✅ 6 Interactive Investment Tools (Scoring Matrix, ROI Modeler, & Cost Calculators). ✅ Database of 50 Verified Golden Sites (PA, OH, & MI) with power/water specs. ✅ PJM Strategy Guide: How to transfer CIRs and bypass the 8-year queue. ✅ 4 Detailed Financial Models (Excel/Web) covering 50MW to 300MW scenarios. ✅ Engineering Blueprints for winterization & free cooling efficiency.

Size
60 KB
Powered by